Severskaya CHP
Power – 12.5 MW.Тип станції: Thermal power plants, Thermal power plantsThe planned capacity of the thermal power plant is 12.5 MWh. The main source of biofuel for the facility is wood chips. This will allow Slavutych to quickly abandon gas consumption and switch to renewable energy sources. Severskaya CHP is located in an industrial zone outside the city.
-
Ternopil biogas station
Power – 659 kW.Degassing station in Ternopil region at Malashivka landfill. Put into operation in April 2021. The planned capacity of the station is 659 kWh. The facility generates energy from methane, which is generated by the decomposition of more than 14 million m3 of garbage and organic waste. Austrian Jenbacher equipment is used for degassing.