Koryukovskaya TPP. The Capacity Of 4000 KW.
Station type: Thermal power plantsThe thermal power plant in Koryukovka, Chernihiv region, was the first major project of Clear energy. It was put into operation in June 2016. The Capacity of the TPP is 4 MW.
-
Polissya TPP
Power – 5.8 MW.Station type: Thermal power plantsThe planned capacity of the facility is 5.8 MWh. Thermal power plant biofuels – wood chips and energy willow. The target date is October 2021. Currently, Polissya TPP is operating in test mode.
-
Severskaya CHP
Power – 12.5 MW.Station type: Thermal power plantsThe planned capacity of the thermal power plant is 12.5 MWh. The main source of biofuel for the facility is wood chips. This will allow Slavutych to quickly abandon gas consumption and switch to renewable energy sources. Severskaya CHP is located in an industrial zone outside the city.