Khmelnitsky biogas power plant. The Capacity Of 659 KW
Тип станції:
Biogas power plants
Розміщення: city Khmelnitsky
Gas-electric generator set in Khmelnitsky city. It was put into operation in November 2017. The Capacity of 659 kW.
Інші проекти
-
Koriukivka TPP part 2. Capacity 6 MW.
+Thermal power plant on biomass in Koriukivka village, Chernihiv region. The station will be the second stage of Clear Energy TPP in Koriukivka with a capacity of 6 MW
-
Kryvyi Rih (PTPW Valyavka) the power plant on biogas. The Capacity Of 1063 KW.
+Gas-electric generator set in the area of the Valyavko-Yuzhnaya mine Kryvyi Rih city. It was put into operation in July 2017. Capacity of 1063 kW.